The road projects are categorized into
* New Roads Construction
* Rehabilitated Roads
* Dual Carriageways
* Network of Roads
* Security & Institutional Road Interventions
1. Southern Senatorial District
New Roads Construction
Projects classified strictly as new road construction total approximately:
* Adiabo Eseku Road – 8.4km
* Ndon Nwong–Atan Odot–Ekpene Eki Road – 17km
* Okurikang–Obot Oko–Akpap Okoyong Road – 5.23km
* Akani Obio/Ukpahata Road – 3.5km
* Uyanga Ifumkpa/Iko Road – 10km
* Nsan–Oban Road & Bridge – 28.025km
* Several urban streets and link roads in Calabar South and Municipality
Total New Roads:
≈ 99.5km
Rehabilitated Roads
Including rehabilitation and maintenance projects such as:
* Murtala Mohammed Highway & Marian Road – 19.17km
* Parliamentary Extension – 6.6km
* Jonathan Bypass – 6km
* Esuk Utan Road – 2.1km
* UCTH Road – 1.285km
* Oban-Ekang intervention – 5km
* Multiple rehabilitation works within security formations
Total Rehabilitated Roads:
≈ 75.9km
Dual Carriageway
* Adiabo Dual Carriageway – 10km
Total Dual Carriageway:
10km
Network of Roads including:
* Okoro Agbor Network
* Ikot Ekpo Eyo–Esuk Mbat Network
* Ekong Nyong Network
* Otomo & Etinyin Abasi Network
* Lincoln & Ikono Network
* Satellite Town & Nyaghasang Network
* Odukpani Network of Roads
Total Network of Roads:
≈ 58.8km
Security & Institutional Road Interventions
Projects within:
* DSS* Police Barracks *MOPOL * Navy
* State CID * Fire Service * FRSC
* Civil Defence *Air Force Base
* INEC Complex *13 Brigade
Total Security & Institutional Interventions:
≈ 32.1km
2. Central Senatorial District
New Roads Construction including:
* Mkpani–Agoi Road – 5km
* Ofumbongha Road – 12km
* Boki East-West Road – 17km
* Nde 3 Corners–Etanawan Road – 2km
* Multiple Yakurr urban roads
Total New Roads:
≈ 49.9km
Rehabilitated Roads Including:
* Etomi Road – 1.5km
* 4 Corners–Okim Osabor–Bokomo Road – 4km
* Mile 2 Road – 1.5km
* Sweet Mother Street – 1km
* Oche Dore maintenance – 0.75km
Total Rehabilitated Roads:
≈ 8.75km
Dual Carriageway
* None recorded
Total Dual Carriageway:
0km
Network of Roads
* Ikom Network of Roads – 11.4km
* Yakurr Network of Roads – 8.24km
Total Network of Roads:
19.64km
3. Northern Senatorial District
New Roads Construction including:
* Yahe–Wanokom–Wanikade Road – 5km
* Yache–Afilokpa Road – 3km
* Ndok Junction–Mbube Road – 10km
* Mfom Okpoma Road – 25km
* Sankwala Ring Road – 3.5km
* Beyaga–Ketiang Road – 4km
* Sankwala–Kuben Road – 5km
* Several Ogoja township roads
Total New Roads:
≈ 57.2km
Rehabilitated Roads including:
* Ndok Junction–Abakpa–Igoli–Monaya Road – 12km
* GRA/Gomora Roads – 1.015km
* Ishibori–Cathedral Road – 1.9km
* Sankwala–Beyaga Road – 3km
Total Rehabilitated Roads:
≈ 17.9km
Dual Carriageway
* Dualization of Mfom–Okuku–Abuochiche–Obudu Ranch Road
Total Dual Carriageway:
145km
Network of Roads
* Ogoja Network of Roads – 18.35km
* Obanliku Network of Roads – 15.5km
Total Network of Roads:
33.85km
Grand Summary Across the State
Category Southern Central Northern Total
New Roads 99.5km 49.9km 57.2km 206.6km
Rehabilitated Roads 75.9km 8.75km 17.9km 102.55km
Dual Carriageway 10km 0km 145km 155km
Network of Roads 58.8km 19.64km 33.85km 112.29km
Security/Institutional Roads 32.1km 0km 0km 32.1km
Total Road Infrastructure Interventions:
≈ 608.5km